news

Product

Contact us

Lianyungang Huade Petrochemical Machinery Co., Ltd. 

Tel: 86-518-83087389

Mobile:86-13815675015

E-mail: hd@lygshj.com.cn

Web site: www.lygshj.com.cn

Address: 117 qu Feng Road, Haizhou Development Zone, Lianyungang City, Jiangsu Province

Web site  :  en.lygshj.com.cn 


What are the requirements for the installation of car crane tubes?

Your current location Home >> News >> Industry news

What are the requirements for the installation of car crane tubes?

Date of release:2018-10-26 Author: Click:

The automobile crane pipe is suitable for distributing all kinds of fuel oil in each oil depot, and can also be used in the automobile and train filling operation of receiving and distributing all kinds of liquid raw materials in chemical and other industries, so it has a very wide range of uses. 

However, there are requirements when the crane pipe is linked to the oil distribution platform. 

1. The connection between the oil platform and the crane pipe is equipped with the corresponding standard flange, and ensures that the foundation flange is firm and reliable, the height of the flange from the ground is 2.1 to 2.2 meters, and the height of the flange from the ground is 2.7 to 2.8 meters when the crane pipe is upside down. 

2. The sealing test of the product has been carried out when the product leaves the factory. When installing, the user only needs to refer to the schematic diagram of the structure, first connect the horizontal short pipe to the foundation flange on the oil delivery platform, and then connect the horizontal short pipe with the lifting arm group. 

Finally, the balancer is installed to connect the balancer pull rod. 

3. After the final assembly is completed, the balancer is adjusted. First, the lifting arm is lifted above 60 °to unscrew the tail end cover of the balancer, and the adjusting screw can make the crane pipe stop in the range of-15 °~ 60 °. 

4. Each flange must be lightly cleaned, and those with sealing grooves must install the O-ring with butter before connecting. 

5. Lubricating oil must be applied to the rotating part of each pin and the spring balancer before installation and use. 

6. When installing the 9th horizontal rotator item, we should pay attention to the horn angle, and the angle should be readjusted again if the angle is incorrect. 

To learn more about the crane pipe, pay attention to the crane tube manufacturer Lianyungang huade Petrochemical Co., Ltd.


The address of this article:http://en.lygshj.com.cn/news/380.html

Key word:Cranetube,Cranetubemanufacturer,Automaticcranetube

The last one:None
The next one:Operating rules for crane tube unloading

Recently browse:

Please leave a message for us
Please input the message here, and we will contact you as soon as possible.
Country
Country
Company name
Company name
Email
Email
Contact person
Contact person